PHOTO: Bridge of Flowers repairs making progress in Shelburne Falls

Funded by roughly $3.2 million from MassWorks, Northern Construction Service LLC of Palmer is working on the Bridge of Flowers repair project in Shelburne Falls. A 2020 study by Tighe & Bond recommended addressing cracks and stabilizing the north spandrel wall. The study also noted that some of the rebar supporting the walls is failing.

Funded by roughly $3.2 million from MassWorks, Northern Construction Service LLC of Palmer is working on the Bridge of Flowers repair project in Shelburne Falls. A 2020 study by Tighe & Bond recommended addressing cracks and stabilizing the north spandrel wall. The study also noted that some of the rebar supporting the walls is failing. STAFF PHOTO/PAUL FRANZ

Published: 09-11-2024 10:07 AM

Yesterday's Most Read Articles

Local ‘Hands Off!’ standouts planned as part of national effort
Incandescent Brewing now open in Bernardston
Two arrested on drug trafficking charges in Greenfield
Berkshire DA says no crime occurred in student-officer relationship at Mohawk Trail
Proposed ordinance would make Greenfield a ‘sanctuary city’ for trans, gender-diverse people
Sounds Local: A legend pays tribute to an icon: Seven-time Grammy-nominated Joan Osborne brings Bob Dylan repertoire to Shea Theater